Water-based epoxy micaceous iron intermediate paint

The product is prepared with water-based epoxy resin, amine curing agent, mica iron oxide and related additives. The coating film has high salt spray resistance, and the product has high sealing performance, which can effectively block the penetration of foreign media into the coating.

WATER-BASED EPOXY MICACEOUS IRON INTERMEDIATE PAINT

The product is prepared with water-based epoxy resin, amine curing agent, mica iron oxide and related additives. The coating film has high salt spray resistance, and the product has high sealing performance, which can effectively block the penetration of foreign media into the coating.

It is suitable for metal coating in the field of heavy anti-corrosion, anti-corrosion and anti-rust of large steel structures, bridges, ships, tower cranes and storage tanks with high anti-corrosion requirements, and can be used with high-performance primers and topcoats to further improve the anti-corrosion performance.

Project Parameter Detection method
Color Iron black, gray Visual
Solids content ≥60% GB/T 1725-2007
Impact-resistant 50kg·cm GB/T 1732-93
Flexure test ≤3mm GB/T 6742-2007
Hardness (pencil) ≥2h GB/T 6739-2006
Adhesion ≤1级 GB 1720-79 (89)
Temperature 5℃ 15℃ 25℃ 35℃
Natural drying time

(Dry film SOμm, humidity

50%)

Surface drying 1h 1h 0.5h 0.3
Actual drying 12h 6h 6 4

 

Matching: 143Z water-based epoxy zinc-rich primer 60μm | 443F Waterborne Epoxy Domicaceous Iron Intermediate Paint 80μm | 666 water-based acrylic polyurethane topcoat 40μm

1. Clean up the oil, rust, old patent leather and other dirt on the surface of the substrate before painting to ensure that the surface of the substrate is clean and dry.

2. Grinding the grinding wheel to remove the welding nodules, spatter, and hardened layer on the surface of the workpiece. All gas cut, sheared or machined free edge sharp angles should be ground to R2.

3. Sandblasting to Sa2.5 or power tools to St2 level, and construction will be carried out within 6 hours after sandblasting.

4. High-pressure airless spraying is recommended to obtain a uniform and good coating film.

5. Before construction, the main material must be stirred evenly with an electric mixer, the curing agent must be added in proportion and stirred again, and the construction can be carried out after 3-5 minutes of curing. During the construction process, it should be stirred continuously to prevent precipitation and affect the quality of the paint film. The mixed paint should be used within 6 hours.

6. Maintain good ventilation during construction, and construction is not recommended when the ambient temperature is low 5 °C or the humidity is greater than 85%.

7. Rain, snow and fog can not be used in outdoor construction, such as construction, can be covered with a tarpaulin to protect the paint film.

1. The product should be sealed and stored in a dry and well-ventilated warehouse, with a storage temperature above 5 °C and below 35 °C, to prevent immersion in water and direct sunlight, isolate the fire source, and keep away from the heat source.

2. The product meets the storage conditions, the storage period is one year from the date of production, and the inspection can be carried out after the storage period, and it can still be used if it meets the standards.

3. During transportation, the product should be protected from severe cold, rain and sun exposure, and should comply with the relevant regulations of the transportation department.

Scroll to Top

Download Catalogue!

Download our catalog to check all of our products and data sheet, select the right coatings for your projects.

ask for quote now