Water-based acrylic topcoat
The product is prepared with water-based acrylic functional emulsion, nano functional materials, anti-rust pigments, corrosion inhibitors and additives. The coating film dries quickly, has low odor, is cost-effective, has excellent paint film hardness and adhesion, strong weather resistance, good water resistance, high gloss and good fullness.

WATER-BASED ACRYLIC TOPCOAT
The product is prepared with water-based acrylic functional emulsion, nano functional materials, anti-rust pigments, corrosion inhibitors and additives. The coating film dries quickly, has low odor, is cost-effective, has excellent paint film hardness and adhesion, strong weather resistance, good water resistance, high gloss and good fullness.
With a suitable water-based primer, it is suitable for the decoration of metal surfaces such as steel structure buildings and workshops, agricultural vehicles, machinery and equipment in light corrosive environments, and has good outdoor weather resistance and ultraviolet resistance.
Project | Parameter | Detection method |
Color | Red, white, etc | Visual |
Fineness | ≤20µm | GB/T 6753.1-2007 |
Solids content | ≥40% | GB/T 1725-2007 |
Glossy (60°) | ≥70 | GB/T 9754-2007 |
Impact-resistant | 50kg·cm | GB/T 1732-93 |
Flexure test | ≤2mm | GB/T 6742-2007 |
Hardness (pencil) | ≥HB | GB/T 6739-2006 |
Adhesion | ≤1级 | GB 1720-79 (89) |
Salt spray resistance | 96h | GB/T 1771-2007 |
Weather resistance | 500h | GB/T 1865-2009 |
Water resistance | 72h no blistering, no shedding | GB/T 1733-1993 |
Temperature | 5℃ | 15℃ | 25℃ | 35℃ | |
Natural drying time
(Dry film SOμm, humidity 50%) |
Surface drying | 1h | 0.5h | 0.3h | 0.3 |
Actual drying | 12h | 6h | 6 | 12 |
Matching 1: 124 water-based acrylic primer 40μm | 624 water-based acrylic topcoat 40μm
Matching 2: 103 water-based alkyd primer 40μm | 624 water-based acrylic topcoat 40μm
1. Clean up the oil, rust, old patent leather and other dirt on the surface of the substrate before painting to ensure that the surface of the substrate is clean and dry.
2. Grinding the grinding wheel to remove the welding nodules, spatter, and hardened layer on the surface of the workpiece. All gas cut, sheared or machined free edge sharp angles should be ground to R2.
3. Sandblasting to Sa2.5 or power tools to St2 level, and construction will be carried out within 6 hours after sandblasting.
4. High-pressure airless spraying is recommended to obtain a uniform and good coating film.
5. Before construction, the main material must be stirred evenly with an electric mixer, the curing agent must be added in proportion and stirred again, and the construction can be carried out after 3-5 minutes of curing. During the construction process, it should be stirred continuously to prevent precipitation and affect the quality of the paint film. The mixed paint should be used within 6 hours.
6. Maintain good ventilation during construction, and construction is not recommended when the ambient temperature is low 5 °C or the humidity is greater than 85%.
7. Rain, snow and fog can not be used in outdoor construction, such as construction, can be covered with a tarpaulin to protect the paint film.
1. The product should be sealed and stored in a dry and well-ventilated warehouse, with a storage temperature above 5 °C and below 35 °C, to prevent immersion in water and direct sunlight, isolate the fire source, and keep away from the heat source.
2. The product meets the storage conditions, the storage period is one year from the date of production, and the inspection can be carried out after the storage period, and it can still be used if it meets the standards.
3. During transportation, the product should be protected from severe cold, rain and sun exposure, and should comply with the relevant regulations of the transportation department.