Epoxy heavy anticorrosive coatings

Epoxy heavy anticorrosive coating is composed of epoxy resin, mica powder, antirust pigment, coloring pigment and modified epoxy curing agent, additives, etc. It has good resistance to dampness and heat and excellent adhesion, and the paint film is strong. The base and top coat are integrated, and can be used as a primer and top coat. It has good chemical resistance, excellent resistance to water, salt water and solvents.

EPOXY HEAVY ANTICORROSIVE COATING

SCOPE OF APPLICATION

It is used for anti-corrosion purposes such as ballast water tanks, water steel gates, sewage storage tanks, pipelines, etc.

 

PRODUCT INFORMATION

Epoxy heavy anticorrosive coating is composed of epoxy resin, mica powder, antirust pigment, coloring pigment and modified epoxy curing agent, additives, etc. It has good resistance to damp heat and excellent adhesion, and the paint film is strong. The base and top coat are integrated, and can be used as a primer and top coat. It has good chemical resistance, excellent resistance to water, salt water and solvents.

Coating appearance The coating film is smooth and matte
Color Limited colors such as white, gray, iron red,
black, etc
Drying time Surface dry ≤ 4h (23 °C) Solid ≤ 24 h (23 °C)
Fully cured 7d(23℃)
Maturation time 20min (23 °C)
Ratio A: B = 4 : 1 (weight ratio)
Adhesion Level ≤1 (Grid)
The recommended number of
coatings
The dry film thickness is 250 μm~300 μm
Density Approx. 1.3g/cm³
OVERCOAT INTERVAL
Substrate temperature 5℃ 25℃ 40℃
Long time 36h 24h 16h
Short time Unlimited
Remark Before applying the post-coat paint, the paint film should be completely dry and free of any contaminants

Front matching: self-priming type, bottom surface integration type.

Construction conditions: the temperature of the substrate must be higher than 3 °C, the temperature of the substrate during outdoor construction, when it is lower than 5 °C, the curing reaction of epoxy resin and curing agent stops, and construction is not suitable.

Mixing: Component A should be stirred evenly first, and then component B (curing agent) should be added to mix, stir evenly thoroughly, and it is recommended to use a power stirrer.

Dilution: After the mixture is evenly mixed and fully matured, an appropriate amount of supporting diluent can be added, stirred evenly, and adjusted to the construction viscosity before use.

The construction site should have a good ventilation environment to prevent the inhalation of solvent gases and paint mist. The product should be kept away from the heat source, and smoking is strictly prohibited on the construction site.

Eyes: If paint splashes into your eyes, rinse immediately with plenty of water and seek medical attention.

Skin: If the skin is stained with paint, rinse with soap and water or use an appropriate industrial cleaner, do not use large amounts of solvents or thinners.

Inhalation or inhalation: due to inhalation of a large amount of solvent gas or paint mist, it should be immediately moved to a fresh place of air, loosen the collar, and let it gradually recover. f ingested with paint, seek medical attention immediately.

Storage: It must be stored in accordance with national regulations, the environment is dry, ventilated and cool, and high temperature and far away from the fire source.

Storage validity: 12 months, after which it should be used after passing the inspection

Packing: 20kg for part A, 5kg for part B

Scroll to Top

Download Catalogue!

Download our catalog to check all of our products and data sheet, select the right coatings for your projects.

ask for quote now