Epoxy glass flake cement coating
Epoxy glass flake cement coating is made of epoxy resin as the main agent, adding glass flakes, accelerators, curing agents and other multi-functional additives, and is made of oily anticorrosive paint by mechanical mixing.

EPOXY GLASS FLAKE CEMENT COATING
REASON FOR SELECTION
SCOPE OF APPLICATION
It is used for anti-corrosion lining of flue gas desulfurization net flue, anti-corrosion lining of various steel and concrete pool grooves.
PRODUCT INFORMATION
Epoxy glass flake coating is made of epoxy resin as the main agent, adding glass flakes, accelerators, curing agents and other multi-functional additives, and is made of oily anticorrosive paint by mechanical mixing, and the product forms a high-strength and high-cohesive anticorrosive layer after construction and curing.
Coating appearance | The coating film is flat and smooth | ||
Scale content(%) | ≥25-35 | ||
Tensile strength | ≥25 | ||
Flexural strength | ≥26 | ||
Impact strength | ≥0.4 | ||
Compressive strength | 5:1(Weight Ratio) | ||
Adhesion | Level ≤1 (Grid) | ||
The recommended number of coatings |
Two coatings, dry film 80-100 μm | ||
Density | Approx. 1.1g/cm³ | ||
OVERCOAT INTERVAL | |||
Substrate temperature | 0℃ | 25℃ | 40℃ |
Short time | 16h | 6h | 3h |
Long time | 7d | ||
Remark | 1. Before applying the post-coating, the front-end coating film should be dry without any pollution. 2. It is not suitable for construction in rainy days, foggy days and relative humidity greaterthan 80%. 3. Wash the tool with thinner before use to remove any water that may exist. |
Construction conditions: the temperature of the substrate must be higher than the dew point of 3 °C, and when the temperature of the substrate is lower than 5 °C during outdoor construction, the curing reaction of epoxy resin and curing agent will stop, and construction should not be carried out.
Mixing: Component A should be stirred evenly first, and then component B (curing agent) should be added to mix, stir thoroughly, and it is recommended to use a power stirrer.
Dilution: After mixing evenly and fully curing, you can add an appropriate amount of supporting thinner, stir evenly, and adjust to the construction viscosity before use.
The construction site should have a good ventilation environment to prevent the inhalation of solvent gases and paint mist.
The product should be kept away from the heat source, and smoking is strictly prohibited on the construction site.
Eyes: If paint splashes into your eyes, rinse immediately with plenty of water and seek medical attention.
Skin: If the skin is stained with paint, rinse with soap and water or use an appropriate industrial cleaner, do not use large amounts of solvents or thinners.
Inhalation or inhalation: due to inhalation of a large amount of solvent gas or paint mist, it should be immediately moved to a fresh place of air, loosen the collar, and let it gradually recover. f ingested with paint, seek medical attention immediately.
Storage: It must be stored in accordance with national regulations, the environment is dry, ventilated and cool, and high temperature and far away from the fire source.
Storage validity: 12 months, after which it should be used after passing the inspection.